Riverview Landing already gave Smyrna a riverfront, with a coffee shop, a brewery and a dock on the Chattahoochee. Its path along the water was gravel. On Thursday, Oct. 8, city, county and Trust for Public Land officials cut the ribbon on a paved, accessible replacement through Riverview Park. It is the first finished piece of a route that will need two more crossings before it reaches anyone who doesn't drive to it.
Walt Ray directs the Trust for Public Land's Chattahoochee program. At the ceremony, as the Marietta Daily Journal reported, he described the setting this way:
"The river was always here, but for many, it was hidden behind the industry, behind roads, behind private property, and it was hidden by the assumptions that we had built about our river."
That idea of a river that was always there but hidden is the clearest way to see what opened in October and what is still under way.
What Opened on October 8
The new section runs along the Chattahoochee through Riverview Park at 6275 Riverview Road, and according to the Marietta Daily Journal it finishes the northern portion of the Cobb RiverLands Showcase Project. The Chattahoochee RiverLands project page describes a paved multi-use path, an improvement on the gravel path it replaced, built for accessibility and offering river views and shade along the way.
The ribbon cutting brought the chain of partners together. Cobb County Commissioner Monique Sheffield, Councilman Rickey Oglesby Jr., U.S. Rep. Lucy McBath, Chattahoochee Riverkeeper Executive Director Jason Ulseth and Ray all spoke. Oglesby kept his remarks practical: "Now the visitors can enjoy a nice walk or jog, water sports, and boat rides right here in Smyrna, Ga."
Amias Jordan, operations manager of Woofie's of Smyrna-Mableton, a mobile pet grooming company, came to celebrate the opening. He told the paper the trail gives his business "a new place to bring the dogs, that's a safe place, a clean place, somewhere I don't have to worry about them stepping on anything that could get them hurt." He added that before the park was finished, good places to walk in the area had been hard to find.
Why the Trail Came After the Cleanup
Jordan said "clean," and the word carries more history on this stretch of river than it would on most trails. In the Marietta Daily Journal's account, Ulseth said that 20 years ago the Chattahoochee here was effectively dead. For decades this stretch was heavily polluted. Two-thirds of the time there was not enough oxygen in the water to sustain fish and wildlife. E. coli counts ran "literally in the millions," against an Environmental Protection Agency standard of 126 or lower.
The paper reports that the recovery followed a lawsuit over sewer spills and more than $2 billion in remediation and infrastructure work. Ulseth framed the new path as the next step: "We don't want the river in a glass case off somewhere where nobody can touch it. We want people here on the river, get to know it, get to love it, and want to protect it."
The larger effort runs on the same thinking. Ray described the full Chattahoochee RiverLands vision as 100 miles of trails and parks from Buford Dam at Lake Lanier to Chattahoochee Bend State Park in Newnan. Cobb's portion is a $48 million project spread across Smyrna, Mableton and the county. Smyrna's new stretch is a small share of 100 miles. Its value is that it is open.
The Sewer Pipe Over Nickajack Creek
The Showcase route runs from Discovery Park, through Riverview Landing, to a trailhead across the river from Proctor Creek, per the Marietta Daily Journal. Discovery Park at the River Line is an existing Cobb County park at 6653 Discovery Blvd. in Mableton, with paved and unpaved trails and its own parking. The two parks are not yet joined by one finished path, so a trip between them is still a drive.
Nickajack Creek is one of the gaps. At the October ribbon cutting, Ray said construction would begin within weeks on a bridge over the creek. It will go where people now cross the water by walking on a large sewer pipe. A Georgia Environmental Protection Division public notice issued June 2, 2026, describes the proposed pedestrian bridge and boardwalk for the Chattahoochee RiverLands Greenway at Nickajack Creek.
That pipe crossing shows how this corridor works. People were already using the route without a bridge, and the bridge is being built to catch up with them.
A Bridge to the Fulton Side, Still in Study
The bigger crossing would go over the Chattahoochee itself. The Marietta Daily Journal reported Nov. 6 that Smyrna is studying whether a pedestrian and bicycle bridge near Riverview Landing is feasible. It would sit between Interstate 285 and Highway 78 and connect Cobb and Fulton counties. In May, the city awarded the study to Kimley-Horn for $800,000. The money comes through a U.S. Department of Housing and Urban Development Economic Development Initiative community project. The city is surveying residents and business owners on priorities and possible uses.
The RiverLands Bridge project page describes an 18-month feasibility, alignment and design study. It is projected to finish in September 2027 and is meant to tie the Silver Comet Trail, the Proctor Creek Greenway and the Atlanta BeltLine together across the river.
Here is how the three pieces line up:
| Piece | Where | Status |
|---|---|---|
| RiverLands Showcase Trail, Smyrna section | Riverview Park, 6275 Riverview Road | Open since Oct. 8, 2026 |
| Nickajack Creek pedestrian bridge and boardwalk | Nickajack Creek, on the Showcase route | Ray said in October that construction would begin within weeks |
| Chattahoochee River pedestrian and bike bridge | Near Riverview Landing, Cobb to Fulton | Feasibility study, projected to finish September 2027 |
Riverview Landing is both the finished northern end of the Cobb route and the proposed landing point for the river bridge. If the bridge moves past study, the trail that opened in October becomes the Cobb approach to it.
Starting From Riverview Landing
For now the trail is a destination in itself, and the businesses at Riverview Landing make it an easy morning or afternoon outing. Chattahoochee Coffee Company runs its shop there, called The Eddy, at 6255 River View Road. Reformation Brewery's Smyrna taproom is on Riverview Road too and lists Thursday through Sunday hours. A loop on the new path begins and ends within walking distance of both.
The water itself is the third draw. The city's Riverview Park page lists parking, a walking trail and a dock with kayak access to the Chattahoochee. That is the "water sports, and boat rides" Oglesby mentioned at the ceremony. It is reachable from the same lot as the trail, and on a cool November weekday the path, the dock and a coffee all fit in under an hour.
A few things are useful to know before going:
- Address: Use 6275 Riverview Road for the park and trail. Riverview Landing's shops are at 6255.
- Surface: The path is paved and accessible, which suits strollers, bikes and older dogs.
- Getting farther: Discovery Park in Mableton is the other anchor of the Cobb Showcase, but the route between the two is not a single continuous trail yet. Plan it as two separate outings.
- Having a say: The city's river bridge survey is open, and the Marietta Daily Journal's Nov. 6 report links to it.
Questions about the bridge study go to the project team at [email protected], the address the city published with the survey.
Every new crossing on the Chattahoochee changes which addresses sit a short walk from the water, and that is the kind of change we follow closely. If you own near Riverview Landing or anywhere along Smyrna's river corridor and want to know how the trail and the planned bridges may affect your property's value, Patti Junger and her team are glad to help. Request a complimentary market valuation and private consultation.